Icao doc 9613 pbn manual volume ii

Pbn Manual Volume Ii - leothanknecom Equipment – The operator should confirm with the Orinal Equipment Manufacturer (OEM), or the holder of installation approval for the aircraft, that acceptance of subsequent changes in the aircraft confuration do not invalidate the integrity (Receiver Autonomous Integrity Monitoring (RAIM) or Space-based Augmentation System (SBAS) snal), procedures should determine the availability of these services and functions as appropriate. Pbn Manual Volume Ii The PBN Manual ICAO Doc 9613 comprises two Volumes. Volume II of the PBN Manual is also made up of three parts. The ICAO Performance

Performance-Based Navation PBN Manual - Eurocontrol For aircraft navating with )/ deviation should be limited to ±½ the navation accuracy associated with the route. Doc 9613. PERFORMANCE-BASED NAVATION MANUAL. AND. VOLUME II. This is termed Performance-based Navation PBN.

PBN Manual - ICAO Doc 9613 Final 5.10.08 - Brief deviations from this standard during and immediately after turns, up to a maximum of one times the navation accuracy are allowable. PBN Manual Doc 9613. see Volume II.4. ICAO navation specifications are contained in Volume II of this manual. 1. PBN Manual Volume II.


Icao doc 9613 pbn manual volume ii:

Rating: 87 / 100

Overall: 90 Rates
Опубликовано

Добавить комментарий

Ваш e-mail не будет опубликован. Обязательные поля помечены *